On-Site or Small Wind Incentives
On Site Small Wind in New York —Cash
Incentives Available
Cash incentives for new wind generation systems are available in New York. Incentive levels vary depending on the size of wind generation system, the tower height, and the class of customer. All customers must pay into the Systems Benefits Charge (SBC)/Renewable Portfolio Standard (RPS) The incentive level for farms, municipal and county governments, not-for-profit facilities, and schools is higher than the base incentive level; multiplication factors are provided below.
The table below lists base incentive levels for specific wind generation systems, plus an adjustment factor if the tower height varies from the ‘standard tower height’ listed.
BASE INCENTIVE LEVELS FOR PON 1098 |
| MANUFACTURER |
MODEL |
DESCRIPTION |
INCENTIVE |
STANDARD TOWER HEIGHT (ft) |
TOWER HEIGHT ADJUSTMENT ($/ft difference from standard tower height) |
| Aerostar |
6 meter |
8.6 kW Wind Turbine |
$19,600 |
80 |
$30 |
| Bergey Windpower |
BWC XL.1 |
1 kW Wind Turbine |
$4,000 |
80 |
$30 |
| Bergey Windpower |
BWC EXCEL |
10 kW Wind Turbine |
$24,000 |
80 |
$30 |
Endurance Wind Power |
S-250 |
4.25 kW Wind Turbine |
$17,000 |
80 |
$30 |
| Entegrity Wind Systems |
EW50 |
50 kW Wind Turbine |
$60,000 |
80 |
$30 |
| Eoltec |
Scirocco E5.6-6 |
6 kW Wind Turbine |
$22,440 |
100 |
$60 |
| Fortis |
Espada |
0.8 kW Wind Turbine |
$2,400 |
80 |
$30 |
| Fortis |
Montana |
5.8 kW Wind Turbine |
$13,600 |
80 |
$30 |
| Fortis |
Alize |
10 kW Wind Turbine |
$28,000 |
100 |
$60 |
| Furhlander |
FL 25 |
25 kW Wind Turbine |
$52,000 |
100 |
$60 |
| Furhlander |
FL 30 |
30 kW Wind Turbine |
$52,000 |
100 |
$60 |
| Furhlander |
FL 100 |
100 kW Wind Turbine |
$84,000 |
100 |
$60 |
| Furhlander |
FL 250 |
250 kW Wind Turbine |
$118,000 |
100 |
$60 |
| Northern Power Systems |
North Wind 100 |
100 kW Wind Turbine 19m rotor |
$76,000 |
100 |
$60 |
| Northern Power Systems |
North Wind 100 |
100 kW Wind Turbine 20m rotor |
$80,000 |
100 |
$60 |
| PacWind |
SeaHawk |
0.5 kW Wind Turbine |
TBD |
80 |
$30 |
| PacWind |
Delta I |
2.0 kW Wind Turbine |
TBD |
80 |
$30 |
| REDriven, Inc. |
FD10.0-20K |
20 kW Wind Turbine |
$40,000 |
100 |
$60 |
| REDriven, Inc. |
FD 8.0-10K |
10 kW Wind Turbine |
$25,600 |
80 |
$30 |
| REDriven, Inc. |
FD6.4-5000 |
5 kW Wind Turbine |
$23,200 |
80 |
$30 |
| REDriven, Inc. |
FD3.6-2000 |
2 kW Wind Turbine |
$10,000 |
80 |
$30 |
| Southwest Windpower |
Skystream 3.7 |
1.8 kW
(2.4kW peak) Wind Turbine |
$7,200 |
80 |
$30 |
| Southwest Windpower |
Whisper 100 |
0.9 kW Wind Turbine |
$2,800 |
80 |
$30 |
| Southwest Windpower |
Whisper 200 |
1 kW Wind Turbine |
$4,000 |
80 |
$30 |
| Southwest Windpower |
Whisper 500 |
3 kW 3000 Wind Turbine |
$9,200 |
80 |
$30 |
| Wind Energy Solutions |
WES 5 |
2.5 kW Wind Turbine |
$10,400 |
80 |
$30 |
| Wind Energy Solutions |
WES 18 |
80 kW Wind Turbine |
$72,000 |
100 |
$60 |
| Wind Energy Solutions |
WES 30 |
250 kW Wind Turbine |
$120,000 |
100 |
$60 |
| Wind Turbine Industries |
31-20 |
20 kW Jacobs 31-20 Wind Turbine |
$37,793 |
100 |
$60 |
The following table lists multiplication factors for incentives. If you fall into any of the categories below, multiply the base incentive level derived from the table above by the multiplication factor in the table below to determine your incentive.
MULTIPLICATION FACTORS FOR INCENTIVES |
Residences, Businesses, Institutional, Government |
Commercial Farms* and Not-for- Profits**, and Municipalities or Counties |
Schools or Colleges that Include Wind in Curriculum*** |
Customers Participating in the Installation |
Multiplier for Second or Third Wind Generator at one Site |
1 |
1.2 |
1.4 |
0.75 |
0.4 |
* Commercial farms must provide evidence that they have at least $10,000 of farm-related average gross sales, excluding any income from leasing land. |
** Not-for-profits must show evidence that they have 501(c)(3) status |
*** Schools and colleges that include wind in their curriculum must demonstrate sufficient educational benefits to NYSERDA to qualify for the higher incentive level. |
Additionally, the New York
Energy $martSMLoan Fund provides interest
rate reductions on loans for energy efficiency projects and
renewable technologies. Interest rates for loans can be reduced
by 4% for up to 10 years. Visit http://www.nyserda.org/loanfund/default.asp for
more information.
How and when are the cash incentives
paid?
There are a few important facts to
know about the incentives offered under this program:
Incentive payments are
not paid directly to the owner of the wind system.
Incentives are paid to
eligible installers that have been approved to participate in
this program.
The entire incentive must
be passed on to the owner of the wind system by the eligible
installer.
Incentives
are paid in two installments. Sixty-five percent (65%) of the
incentive is paid after the equipment is delivered to the installation
site and all required permits, approvals, certificates, etc.
from all jurisdictions having authority are secured. The remaining
thirty-five (35%) is paid when the wind system is grid-connected
and approved by your utility. NYSERDA reserves the right to review
any installation prior to final incentive payment being made.
YOU SHOULD WORK
WITH YOUR INSTALLER TO OBTAIN ALL NECESSARY PRE-CONSTRUCTION
PERMITS, APPROVALS, CERTIFICATES, ETC. FROM ALL JURISDICTIONS
HAVING AUTHORITY PRIOR TO ORDERING EQUIPMENT SINCE NYSERDA WILL
NOT PROCESS ANY PAYMENTS WITHOUT PROOF THAT ALL PERMITS HAVE
BEEN OBTAINED.
Incentives
will not be paid for wind systems installed by contractors or
individuals that are not on NYSERDA's list of eligible installers.
What are some
of the other benefits of buying a wind system under this program?
All wind systems installed with incentives
by this program will come with a full five-year parts and labor
warranty. The wind system will include an easy-to-read digital
meter allowing customers and installers to monitor system performance.
All wind systems will be monitored for energy production, at
least twice a year, for two years. If the wind system is not
operating at specified performance goals, an installer will inspect
the system components. NYSERDA will review each proposed wind
system design, all incentive applications, and every customer
purchase agreement. The scope of the NYSERDA review shall be
limited solely to determining whether NYSERDA's program conditions
have been met and shall not include any type of safety review.
NYSERDA shall work closely with each eligible installer and monitor
their performance throughout the program.
Please Note :
NYSERDA is not responsible for assuring that the design, engineering
and construction of the project or installation of any wind system
is proper or complies with any particular laws (including patent
laws), regulations, codes, or industry standards. NYSERDA does
not make any representations of any kind regarding the results
to be achieved by the wind systems or the adequacy or safety
of such measures.
What paperwork will I need to fill
out to participate in the program?
Eligible installers are responsible
for all paperwork required under this program.
Customers shall sign the incentive
application form and a customer purchase agreement prepared by
the installer. The customer purchase agreement will outline total
installed costs, provide detailed costs of all major components,
identify the expected cash incentive(s), and provide an installation
schedule. Customers shall sign off on the packing slip indicating
all system components have been delivered to the installation
site.
How do I get started?
It's Easy! The eligible installers
list will be updated as new installers are added to the program.
Please check the list periodically. The program was launched
in June 2003 and new installers continue to be added to the
eligible installer list.
Eligible installers have been selected
based on their experience installing wind systems, training,
education, and recommendations from past customers. Installer
performance will be continually monitored through inspections,
customer feedback, and ability to meet all program terms and
conditions. Installers may be removed from NYSERDA's program
if they do not meet the program requirements.
Contact any of the eligible installers
or visit www.powernaturally.org to
learn more about wind systems, applications, costs, and anticipated
benefits from a system.
That's it! It's just that simple!
If you need any further information
or have a question regarding NYSERDA's New York Energy $martSM Wind
Incentive Program or other NYSERDA programs, please call (518)
862-1090 or send an email to info@nyserda.org .
|
|
 |
 |
|
 |